How fast can I get custom stickers?
Standard production is 3 to 5 business days after you approve your proof, plus 1 to 5 days of transit depending on the shipping method. Rush production of 1 to 2 business days is available at checkout. Approving your proof quickly is the fastest way to shorten the timeline.
| Proof | Within 1 business day |
|---|---|
| Standard production | 3-5 business days |
| Rush production | 1-2 business days |
| Banners and signs | 2-4 business days |
| Transit | 1-5 business days |
The real timeline
- Order placed. Same day.
- Proof emailed. Within one business day, often same day if the file arrives before 2 PM ET.
- You approve. This is the step that varies most. The production clock does not start until you do.
- Production. 3 to 5 business days standard, 1 to 2 rush.
- Transit. Ground is 1 to 5 business days from South Carolina, with the east coast usually 1 to 2.
Realistically, most standard orders arrive 5 to 8 business days after ordering. A rush order approved same-day with expedited shipping can land in 3.
Need it for a specific date?
Put the in-hands date in the order notes. We will tell you honestly before charging rush whether it is achievable, and we will not take rush money for a date we cannot hit.
What slows orders down
- Slow proof approval, by far the biggest factor
- Low-resolution or missing artwork requiring back and forth
- Custom multi-design sheet cut paths, which add a day
- Specialty materials that are not on the floor that week
Business days
Production runs Monday through Friday, 9 AM to 5 PM ET, excluding US holidays. Orders placed Friday afternoon proof on Monday.
